<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Facades And Cladding &#8211; Guildmore</title>
	<atom:link href="https://guildmore.com/category/facades-and-cladding/feed/" rel="self" type="application/rss+xml" />
	<link>https://guildmore.com</link>
	<description></description>
	<lastBuildDate>Sun, 25 May 2025 20:32:42 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://guildmore.com/wp-content/uploads/2025/05/cropped-Screenshot-2023-12-18-at-11.19.35-150x150.png</url>
	<title>Facades And Cladding &#8211; Guildmore</title>
	<link>https://guildmore.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Salmon Youth Centre</title>
		<link>https://guildmore.com/salmon-youth-centre/</link>
					<comments>https://guildmore.com/salmon-youth-centre/#respond</comments>
		
		<dc:creator><![CDATA[contact@axosocial.com]]></dc:creator>
		<pubDate>Thu, 24 Oct 2024 09:52:23 +0000</pubDate>
				<category><![CDATA[Facades And Cladding]]></category>
		<guid isPermaLink="false">https://guildmore.com/?p=6105</guid>

					<description><![CDATA[<p>Scope of works: The ambitious project, valued at £4.3 million, aimed to enhance the safety, functionality, and aesthetic quality of both buildings. A comprehensive plan was executed, with a strong focus on improving fire safety measures and upgrading the façades to meet modern compliance standards. Erection of Scaffolding: The first phase involved the full erection [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/salmon-youth-centre/">Salmon Youth Centre</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Scope of works:</strong></p>



<p>The ambitious project, valued at <strong>£4.3 million</strong>, aimed to enhance the safety, functionality, and aesthetic quality of both buildings. A comprehensive plan was executed, with a strong focus on improving fire safety measures and upgrading the façades to meet modern compliance standards.</p>



<p><strong>Erection of Scaffolding:</strong> The first phase involved the full erection of independent scaffolding, which was entirely boarded and enclosed in protective netting. Haki staircases and goods hoists were also installed to facilitate efficient operations.</p>



<p><strong>Removal of Existing Façade Components:</strong> Outdated and combustible façade materials were carefully removed, including rainscreen cladding systems, EPS rendering, and spandrel panels. Their removal was a key priority, as these elements no longer met the latest safety standards.</p>



<p><strong>Installation of New Façade Components:</strong> The buildings were upgraded with new, non-combustible aluminium cassette panels, which form part of the rainscreen cladding. Fire barriers, high-grade insulation, and support systems were installed to ensure compliance with the latest fire safety regulations. Waterproofing was also enhanced, particularly around openings, with the installation of new sheeting boards.</p>



<p>Brickwork Adjustments and Fire Barriers Installation: In addition to the façade upgrades, the project involved adjusting brickwork and installing fire barriers. This included the careful removal of bricks at slab levels, party walls, and openings to install new waterproofing membranes and replacement boards. These structural improvements have significantly bolstered the overall fire resilience of both the Salmon Youth Centre and Davoll Court.</p>



<p></p>
<p>The post <a rel="nofollow" href="https://guildmore.com/salmon-youth-centre/">Salmon Youth Centre</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://guildmore.com/salmon-youth-centre/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>South Central</title>
		<link>https://guildmore.com/south-central/</link>
					<comments>https://guildmore.com/south-central/#respond</comments>
		
		<dc:creator><![CDATA[contact@axosocial.com]]></dc:creator>
		<pubDate>Mon, 18 Dec 2023 15:51:45 +0000</pubDate>
				<category><![CDATA[Facades And Cladding]]></category>
		<guid isPermaLink="false">https://guildmore.com/?p=1574</guid>

					<description><![CDATA[<p>Client: Parkgate AspenConsultant: Bennington GreenContract Value: £2.8 MillionContract: JCT Design &#38; Build Brief Overview:The main works included the installation of a new A2-s1,d0 External Wall Insulation System (Mineral Wool Silicone Render) following all combustible materials were removed from the external walls as per the project&#8217;s scope. The nature of remediation works is you can never [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/south-central/">South Central</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client: Parkgate Aspen<br />Consultant: Bennington Green<br />Contract Value: £2.8 Million<br />Contract: JCT Design &amp; Build</strong></p>



<p><br />Brief Overview:<br />The main works included the installation of a new A2-s1,d0 External Wall Insulation System (Mineral Wool Silicone Render) following all combustible materials were removed from the external walls as per the project&#8217;s scope. The nature of remediation works is you can never anticipate what you will find, prompting ongoing design details to account for the unexpected.</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/south-central/">South Central</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://guildmore.com/south-central/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Westminster Green</title>
		<link>https://guildmore.com/westminster-green/</link>
					<comments>https://guildmore.com/westminster-green/#respond</comments>
		
		<dc:creator><![CDATA[contact@axosocial.com]]></dc:creator>
		<pubDate>Mon, 18 Dec 2023 15:27:17 +0000</pubDate>
				<category><![CDATA[Facades And Cladding]]></category>
		<guid isPermaLink="false">https://guildmore.com/?p=1569</guid>

					<description><![CDATA[<p>Client: Westminster GreenManagement CompanyConsultant: Calford SeadonContract Value: £5.8 MillionContract: JCT Intermediate Brief Overview:We provided early contractor advice to the Client and their consultation team ahead of the main works progressing to assist them in achieving an EWS1 grade of A1. Replacement cladding and insulation is being installed on a phased basis, plus taking down and [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/westminster-green/">Westminster Green</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client: Westminster Green<br />Management Company<br />Consultant: Calford Seadon<br />Contract Value: £5.8 Million<br />Contract: JCT Intermediate</strong></p>



<p></p>



<p>Brief Overview:<br />We provided early contractor advice to the Client and their consultation team ahead of the main works progressing to assist them in achieving an EWS1 grade of A1. Replacement cladding and insulation is being installed on a phased basis, plus taking down and rebuilding of the adjacent masonry at 8th floor level. Other remedial works include providing fire compartmentation to demonstrate a fire safety case for continued occupation. This scheme involves linear remediation works</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/westminster-green/">Westminster Green</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://guildmore.com/westminster-green/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Gallions</title>
		<link>https://guildmore.com/gallions/</link>
					<comments>https://guildmore.com/gallions/#respond</comments>
		
		<dc:creator><![CDATA[contact@axosocial.com]]></dc:creator>
		<pubDate>Mon, 18 Dec 2023 15:13:38 +0000</pubDate>
				<category><![CDATA[Facades And Cladding]]></category>
		<guid isPermaLink="false">https://guildmore.com/?p=1566</guid>

					<description><![CDATA[<p>Client: Gallions Approach Management Consultant: Hart DixonContract Value: £25 MillionContract: JCT Design &#38; Build Scope of work includes for removal of combustible façade elements and installation of new complaint system.</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/gallions/">Gallions</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client: Gallions Approach Management</strong></p>



<p><strong>Consultant: Hart Dixon<br />Contract Value: £25 Million<br />Contract: JCT Design &amp; Build</strong></p>



<p><strong>Scope of work includes for removal of combustible façade elements and installation of new complaint system.</strong></p>



<ul class="wp-block-list">
<li>Removal of existing insulated(polystyrene) render and installation of new EWI Soltherm render system.</li>



<li>Removal of existing terracotta and combustible Kingspan insulation and installation of new Taylor Maxwell terracotta tiles, new sub-grid system,  Siderise cavity barriers and Knauf rainscreen insulation</li>



<li>Removal of existing combustible SFS sheathing board and installation of new infill insulation and new Y wall(behind render) and Siniat (behind terracotta) sheathing boards.</li>



<li>Removal of existing flammable ACM cladding at roof soffits level and installation of new aluminium cladding panels</li>



<li>Removal of existing timber decking and installation of new aluminium decking supplied by Mydek.</li>
</ul>
<p>The post <a rel="nofollow" href="https://guildmore.com/gallions/">Gallions</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://guildmore.com/gallions/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Basin D</title>
		<link>https://guildmore.com/basin-d/</link>
					<comments>https://guildmore.com/basin-d/#respond</comments>
		
		<dc:creator><![CDATA[contact@axosocial.com]]></dc:creator>
		<pubDate>Mon, 18 Dec 2023 15:06:16 +0000</pubDate>
				<category><![CDATA[Facades And Cladding]]></category>
		<guid isPermaLink="false">https://guildmore.com/?p=1563</guid>

					<description><![CDATA[<p>Client: Limehouse East Management LTDConsultant: ArambolContract Value: £3 MillionContract: JCT Intermediate Following survey works, we are currently removing the combustible cladding system including fire barriers, installation, CP board, insulation within SFS, replacement spandrel panels andwe are also providing balcony refurbishment. Replacement EWI, Cladding and Insulation is being installed on a phased basis with the balcony [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/basin-d/">Basin D</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Client: Limehouse East Management LTD<br />Consultant: Arambol<br />Contract Value: £3 Million<br />Contract: JCT Intermediate</strong></p>



<p><br />Following survey works, we are currently removing the combustible cladding system including fire barriers, installation, CP board, insulation within SFS, replacement spandrel panels and<br />we are also providing balcony refurbishment.</p>



<p><br />Replacement EWI, Cladding and Insulation is being installed on a phased basis with the balcony decking<br />also being replaced. Other remedial works include providing fire compartmentation to demonstrate a fire safety case for continued occupation. This scheme involves linear remediation works</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/basin-d/">Basin D</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://guildmore.com/basin-d/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Ropeworks</title>
		<link>https://guildmore.com/ropeworks/</link>
					<comments>https://guildmore.com/ropeworks/#respond</comments>
		
		<dc:creator><![CDATA[contact@axosocial.com]]></dc:creator>
		<pubDate>Mon, 18 Dec 2023 15:01:46 +0000</pubDate>
				<category><![CDATA[Facades And Cladding]]></category>
		<guid isPermaLink="false">https://guildmore.com/?p=1560</guid>

					<description><![CDATA[<p>Client: Barking Central Management Consultant: Hart DixonContract Value: £17.5 MillionContract: JCT Design &#38; Build Brief Overview:The Works include removal of existing non-compliant HPL Trespa Meteon, EWI Render systems and Support framework together with Monolithic Aluminium panels and Balcony Decking. And replacement with compliant Soltherm Ultimate HD Silicone Mineral EWI System and monolithic aluminium panels systems [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/ropeworks/">Ropeworks</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Client: Barking Central Management</p>



<p><strong>Consultant: Hart Dixon<br />Contract Value: £17.5 Million<br />Contract: JCT Design &amp; Build</strong></p>



<p>Brief Overview:<br />The Works include removal of existing non-compliant HPL Trespa Meteon, EWI Render systems and Support framework together with Monolithic Aluminium panels and Balcony Decking. And replacement with compliant Soltherm Ultimate HD Silicone Mineral EWI System and monolithic aluminium panels systems (comprising Mineral wool Insulation, breather membrane, fire barriers at floor slab and windows, EPDM to windows, new CP Boards, VCL, balcony capping and panels)</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/ropeworks/">Ropeworks</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://guildmore.com/ropeworks/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Baltic Quay</title>
		<link>https://guildmore.com/hey-world/</link>
					<comments>https://guildmore.com/hey-world/#respond</comments>
		
		<dc:creator><![CDATA[contact@axosocial.com]]></dc:creator>
		<pubDate>Sun, 03 Dec 2023 00:12:56 +0000</pubDate>
				<category><![CDATA[Facades And Cladding]]></category>
		<guid isPermaLink="false">https://guildmore.com/?p=1349</guid>

					<description><![CDATA[<p>Baltic Quay London Freehold LtdConsultant: Bennington GreenContract Value: £3.3 MillionContract: JCT Design &#38; Build Following survey works, we removed the combustible cladding system including fire barriers, spandrel panels and we also provided a balcony refurbishment. Replacement cladding and insulation were installed on a phased basis over a 6-month period ensuring to minimalize disturbance to the [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/hey-world/">Baltic Quay</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Baltic Quay London Freehold Ltd<br />Consultant: Bennington Green<br />Contract Value: £3.3 Million<br />Contract: JCT Design &amp; Build</strong></p>



<p>Following survey works, we removed the combustible cladding system including fire barriers, spandrel panels and we also provided a balcony refurbishment.<br /><br />Replacement cladding and insulation were installed on a phased basis over a 6-month period ensuring to minimalize disturbance to the residents. Other remedial works include providing fire compartmentation in order to demonstrate a fire safety case for continued occupation.</p>
<p>The post <a rel="nofollow" href="https://guildmore.com/hey-world/">Baltic Quay</a> appeared first on <a rel="nofollow" href="https://guildmore.com">Guildmore</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://guildmore.com/hey-world/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
