Frampton Arms & Lyttelton House 

CLIENT: London Borough of Hackney
SIZE & SCALE: 45 Units
VALUE: £15m
DURATION:April 2018 – November 2020

Scope of works:

• Frampton Arms, with 3 no., new 5-storey buildings, accommodating 20 new residential units for shared ownership and social rent.

• Lyttleton House 4-storey and part 5-storey building, accommodating 25 new residential units for shared-ownership and private sale.

• This site is part of Hackney Council’s borough-wide 2,760-home estate regeneration programme

What They Say About Us

Overview

Form of Construction:
• CFA Piled foundations, RC Frame Superstructure

• Brickslip clad feature arch and window heads

• SFS/Special Brick (extra slim)/Rockwool external walls

• Part-Brown roofs

• PV on aluminum carrier system

• Individual gas boilers

• MVHR

Engagement with key Stakeholders:

• High level of ongoing communication and liaison throughout the project with all involved.

• Early engagement with nearby businesses, neighbours and youth groups to understand stakeholder need and implement safeguards.

• Regular ‘Meet the Builder’ events and resident 1-1s to allay any worries about the construction works.

• Close consultation with Transport for London ensuring all bus stops nearby were kept operational.

• Regular newsletter drops on upcoming contruction work and distruptions.

Challenges

• Considered approach to site setup, traffic management, road closures and diversions to facilitate the works while minimising inconvenience to current residents.

• Strategic suspension and relocation of parking bays throughout construction.

• Deliveries planned on a peak arrival/departure time to avoid busy traffic periods.

• Facilitated waste disposal and recycling for any nearby local residents affected.

Gallery

Discuss Your Next Project With Guildmore

If you’d like to find out how we can work together to shape a greener future, please feel free to get in touch.