At Block B, we’ve completed the brickwork now on the ground floor and the steels are in place.  On the 1st floor, we’ve Installed the pre-cast floor slabs and staircase.

At Block A, we’ve commenced the brickwork and are getting ready to place the steels for the 1st floor planks. The basement is now complete.

Similar Posts

Comments are closed.